| Construction
Images North Arlington Transmission Project |
These construction photos below were taken from a similar power line project.
Trenches are prepared using excavation equipment, as seen below.

A ductbank is prepared to carry the underground cables.

Filling of the ductbank.
|
![]() |
Cable arrives on large reels to be installed underground.

Cable is fed into the underground ductbank.

Underground vaults/manholes are constructed for cable splices (connection points).
![]() |
![]() |