Second 115kV Line
 

The existing 115kV Line No. 52 from Kitty Hawk to Nags Head is forecasted to reach maximum capacity by 2012. A proposed second transmission line is needed to provide the necessary service to support continued economic growth on the Outer Banks and provide an alternate source of electrical service to the area.

The 7.4-mile second 115kV line will alleviate overloading of the existing line, provide an additional transmission source for the load area and improve reliability by eliminating outages for the single contingency loss of the existing transmission source south of Kitty Hawk.

Project Update - 9/18/07

  • The North Carolina Utilities Commission issued an Order on September 18, 2007 that directs Dominion to proceed with its plans to complete this second 115kV line from Kitty Hawk Substation along the east side of the Rt. 158 Bypass.
    >> View the order.