ID:82
The following employee transfer is effective May 1, 2005: Donna L. LeFevre - From:Transmission Sys Operator, Electric Transmission Sys. Operations,To: Gener Sys. Operator, Electric Market Operations.
| 04/28/2005 11:58:14 |
ID:81
The following employee transfers are effective May 1, 2005: Sammie E. Black- From:Transmission Sys Operator, Electric Transmission Sys. Operations,To: Gener Sys. Operator, Electric Market Operations.
Robison E. Bridges, Jr. From:Transmission System Operator, Electric Transmission System Operations,To: Generation System Operator, Electric Market Operations.
James E. Carr, From:Transmission System Operator, Electric Transmission System Operations,To: Generation System Operator, Electric Market Operations.
Loureathe Knight, From: Power Analyst, Electric Transmission System Operations Engineering, To: Power Analyst, Generation Operational Accounting.
| 04/28/2005 11:55:37 |
ID:79
Dominion Virginia Power recieved emergency power at 0924 hrs on 05/24/2004.
| 05/24/2004 09:38:54 |
ID:78
Dominion Virginia Power recieved emergency power from 1000 hrs until 1900 hrs on 05/21/2004.
| 05/21/2004 19:17:10 |
ID:75
Dominion Virginia Power recieved 12 MW's of emergency power on 05/19/2004.
| 05/19/2004 14:33:21 |
ID:74
Dominion Virginia Power recieved 12 MW's of emergency power on 05/18/2004.
| 05/18/2004 21:01:46 |
ID:73
On 05/17/2004 at approximately 1017 hrs Dominion Virginia Power spoke with a power marketer advising them that a transmission system emergency has been relieved allowing an IPP within VAP's
control area to be available to come online.
| 05/17/2004 10:34:46 |
ID:72
On 05/17/2004 at approximately 0913 hrs Dominion Virginia Power spoke with a power marketer advising them that due to a transmission system emergency an IPP located within our transmission system
would not be available to come online. As soon as the transmission system was available VAP will contact the power marketer advising them the IPP would be able to come online.
| 05/17/2004 09:21:31 |
ID:70
On 05/12/2004 at approximately 0935 hrs Dominion Virginia Power spoke with a power marketer advising them that due to a transmission system emergency an IPP located within our transmission system
would not be available to come online. As soon as the transmission system was available VAP will contact the power marketer advising them the IPP would be able to come online.
| 05/12/2004 09:55:22 |
ID:69
Dominion Virginia Power recieved 12 MW's of emergency power on 05/11/2004.
| 05/12/2004 06:40:26 |
ID:66
Dominion virginia Power delivered emergency power at 1256 05/06/2004.
| 05/07/2004 08:39:55 |
ID:60
In a non-recorded phone conversation on 4/28/2004 a non-affiliated marketer was told that if we are not exercising discretion then daily firm requests must be made prior to 10:00 AM day ahead.
If they are made after that time they will not be considered. However, if discretion is being observed, daily firm requests can be accepted even if they are made that same day.
While this option is mostly available, Murphy's Law is that we are not exercising discretion when the marketer needs the firm transmission the most.
The marketer was told to check our business practices for instances when discretion definitely will not be exercised. HNF timing was also verified.
| 05/04/2004 06:32:14 |
ID:55
As authorized in a December 5, 2003 e-mail from Kevin R. Smith, Vice President, Tenaska Power Services Co., Dominion Virginia Power Transmission Provider function will provide real-time telemetry
data and daily meter readings for the combined cycle generating units owned by Tenaska Virginia Partners, L.P. while Dominion Energy Supply group (an affiliated merchant group) is purchasing test
energy from this facility. Upon notification to the Transmission Provider that the facility has or will commence commercial operation, this data will cease to be provided.
| 01/12/2004 13:52:15 |