Corporate

Beaumeade - NIVO 230kV Double-Circuit Line

Dominion has completed the construction of the Beaumeade to NIVO underground 230 kV transmission line.

Project Description

In the Ashburn area of Loudoun County, new development is increasing electrical demand. Our existing Beaumeade substation is fully utilized and requires additional facilities and the Ashburn area requires an additional substation to meet the growing demand for power.

  • Dominion has expanded and added additional facilities to the Beaumeade substation located off Smith Switch Road near the W&OD Trail.
  • Dominion installed a 230 kV double circuit underground transmission line, approximately 2700 feet (0.5 mile±) long, from the existing Beaumeade substation to a new substation (NIVO) located near the intersection of Smith Switch Road and Chilum Place. This project was approved by the SCC as a qualifying pilot project under House Bill 1319.
  • The new NIVO substation is located at the DuPont Fabros Ashburn Corporate Center and serves the increase in electrical load due to construction of new data center facilities.

Project Details

Transmission Line and Substation Update

Dominion Virginia Power has completed the construction of the Beaumeade to NIVO underground 230 kV transmission line.  This transmission line was energized in July 2010.

We appreciate the patience of our neighbors as we completed this critical new infrastructure project to serve Loudoun County residents and businesses.

Route Map
Fact Sheet
SCC Application

The Virginia State Corporation Commission (SCC) has regulatory authority over the need for the project, the route, and the environmental impact of electric transmission lines in Virginia. Typically, the SCC holds public hearings in the area, where anyone may address the SCC. If the findings of the SCC uphold the need for the line and route, the company is then required to comply with all applicable environmental state and federal laws.

  • Dominion filed this project with the SCC on July 21, 2008. View the Application, Appendix, and the DEQ Supplement.
  • Case number PUE-2008-00063 has been assigned to this project. Review the case: http://docket.scc.virginia.gov/vaprod/main.asp
  • The Virginia State Corporation Commission (SCC) held a public hearing for this underground transmission line project on January 26, 2009.
  • The Virginia State Corporation Commission issued its final order on May 29, 2009, approving the installation of the Beaumeade-NIVO 230 kV underground transmission line.
Project Schedule
  • Second Quarter 2008: File SCC application.
  • First Quarter 2010: Start substation and transmission line construction.
  • Second Quarter 2010: Complete substation and transmission line construction.
  • Fall 2010:  Complete landscape planting.
Contact Us
  • Contact us if you need additional information or have questions.