Corporate

Non-Residential Energy Audit Terms and Conditions

These terms and conditions apply to the Non-Residential Energy Audit Program. This program has been approved by the Virginia State Corporation Commission.

Any reference in these documents to “Dominion” should be read as a reference to Virginia Electric and Power Company d/b/a Dominion Virginia Power, as well as its authorized agents and contractors.

Qualifications/Participation
  • Service must be performed after July 1, 2012.
  • Customer is eligible for one audit per location during the program time period.
  • Work must be completed by a participating contractor in Dominion's Contractor Network.
  • Applicant must be a Dominion Virginia Power non-residential customer with average monthly demand of 10 megawatts or less who has not opted out of participation, is responsible for the electric bill and be the owner of the facility or reasonably able to secure permission to complete measures.
  • Additional measures not performed during the audit must be completed within 6 months of the audit date.
  • I understand that I may be contacted by Dominion Virginia Power via survey or questionnaire to provide feedback on my satisfaction with the program.
  • Dominion Virginia Power and/or its designees including program administrators and evaluation contractors reserve the right to review installations to verify completion and measure energy savings to ensure compliance with all program requirements. Such reviews will be made at a time convenient to the applicant. Denial of such verification or misrepresentation of installation location or measure eligibility may result in forfeiture of the rebate.
  • Service must be completed in accordance with all laws, codes and other requirements applicable under federal, state and local authority.
  • I understand that through participation in this energy conservation program and receiving a rebate, I am ineligible to opt out of energy efficiency programs for a period of three years following my year of participation.
Payment
  • Rebate payments are based on the date of service. Customers must abide by the rules and rebate levels in effect on the date of service.
  • Payment will be issued to the account holder and mailing address on record with the utility - unless the customer has authorized the rebate to be paid to the contractor.
  • Please allow up to 90 days from the date all required information is received to process your rebate.
  • You are urged to seek appropriate consultation concerning any tax liabilities that could be associated with the receipt of the rebate.
Other
  • Program procedures, requirements and rebate levels are subject to change or cancellation without notice and are subject to program funds being available and regulatory approval.
  • Dominion Virginia Power, its parents, subsidiaries, employees, affiliates and agents assume no responsibility for the performance of the equipment or equipment warranty, the quality of the work, labor and/or materials supplied, and/or the acts or omissions of the participating contractor.
  • The customer hereby agrees to indemnify, defend and hold harmless Dominion Virginia Power, its parents, subsidiaries, employees, affiliates and agents from any and all liability associated with this project.
  • Virginia Electric and Power Company (the “Company”) retains all rights to energy and demand savings resulting from measures installed under this Program for a maximum of four years.  The Company has the exclusive right to enroll, nominate, or offer a bid for energy or demand reductions resulting from measures installed under this Program into load management programs, demand response programs, or auctions operated by PJM Interconnection, L.L.C. (“PJM”), the regional electric transmission entity of which the Company is a member.  The Company may share pertinent information of participating customers with PJM and with the Company’s agents and contractors.  Pertinent customer information includes, but is not limited to, account holder name, account number, energy use, billing information, address, other contact information, measures installed, period of installation, demand/energy reductions resulting from measures installed under this Program and the technical basis for such reductions, loss factors, coincidence factors, interactive factors, building type and other information necessary to implement and monitor the Program including other information as required by PJM.
NYSE : (April 16, 2014) D 71.53 0.96